Over the years, Wuxi Triumph Gases Equipment Co., Ltd has been working on the development and production of the whole industrial chain of gasification stations in the LNG industry and the total package of the project. By virtue of the design advantages in gas industry, complete products, reliable quality and service in the natural gas industry, finally Towngas Investment Corporation decides to work with Triumph, jointly research and develop the most compliance, the most advanced, the highest degree of integration of LNG skid mounted gas supply equipment.
The equipment consists of three parts: LNG storage tank skid, LNG gasification decompression&metering skid and intelligent station control system. Skid mounted equipment all use standard 40 feet container frame as a complete structure. The entire gasification station is highly integrated, intelligent control, install without fire on site , the whole project can safely and stably supply gas within 3-6 hours after the arrival of the equipment.
All the skid mounted products for this project have been jointly applied for national patent and accepted successfully.
|